2023 Author: Philip Bishop | [email protected]. Last modified: 2023-08-25 07:54
- Where to start the first stage of apartment renovation - ceiling
- Where to start the second stage of apartment renovation - walls
- Repair cost, approximate cost estimate for apartment work
- Average cost of construction work in an apartment
When you mention apartment renovation, is your thought limited to the picture of demolishing partitions and replacing windows? No problem. Today you will be able to get a short combat plan called " Stages of repairing an apartment purchased on the secondary housing market." After reading our tips, you will definitely not torment yourself with the question of where to start renovating an apartment with your own hands or with the help of professionals. Our website dedicated to self-repair of an apartment will help you with the first option. So, let's take a look at the tips.
Where to start the first stage of apartment renovation - ceiling
Ceiling repair is the most urgent topic for many tenants who have purchased an apartment on the secondary market. After all, most of the new owners have to face a number of "ceiling problems" every day, from crumbling plaster to cracks in the ceiling.

Where to start repairing the ceiling? It is carried out according to the same simple scheme as repairing walls and floors:
- Dismantling.
- Alignment.
- Painting.
As a rule, water-dispersion paint is most often used for painting ceiling coverings; in older houses, lime whitewash is also found, less often oil or alkyd enamel. Surely you are tormented by the question: how easy is it to wash off old paint?
Whitewash can be washed off with water. The work is very painstaking, but the quality of the execution depends on how well the new coating will fit. If the previous owners tried their best and applied several layers of whitewash, then you will have to arm yourself with a steel spatula and a basin of water.
The next step in the preparatory work is leveling the ceiling. The appearance of the ceiling and its reliability in the future depends on how accurately and efficiently you perform this operation. If you want to make a modern, beautiful ceiling, then see the article "Do-it-yourself plasterboard ceiling" - detailed installation instructions with photos and video materials. Now we will continue to answer the question: where to start and how to finish the repair work.

First of all, it is necessary to determine the difference in ceiling levels in order to know how thick the layer will need to be applied. If the deviations are less than 50 mm, then a primer and putty will be your reliable assistants. If there are cracks on the surface of the ceiling, then they will need to be expanded with a spatula first, and then cleaned and primed.
Remember: the strength and longevity of the ceiling depends on how well the primer is made. The deeper the primer is absorbed, the better the subsequent products will apply and hold. Likewise with putty. How well the putty is done depends on how smooth the ceiling will be.
The main function assigned to the primer is to impregnate the concrete surface in order to ensure a reliable and strong adhesion of the entire surface and the layers applied to it. Accordingly, the putty is responsible for leveling the surface and eliminating minor defects.
The final chord in the galaxy "where to start repairing the ceiling covering" is the actual painting of the ceiling. Acrylic, latex, silicate, silicone paints and which paint is better to choose. Even this does not end with the list of products in the hardware store that will help you draw the final line under the repair and ceiling work. See what paint to choose for the ceiling, depending on your needs.
Repairing ceilings is a rather cumbersome and laborious undertaking that requires patience and meticulousness. Only with the right approach can you achieve the desired result - a snow-white, even and strong ceiling that will delight you for a long time. However, the burden of worries about the repair of the ceiling covering can be shifted onto the shoulders of professionals from construction companies. If you have noisy neighbors from above, then you need soundproofing of the ceiling in the apartment, you can do it yourself with your own hands.
Where to start the second stage of apartment renovation - walls
The most significant element of the interior is the walls. It is to them that the most attention is paid, and, oddly enough, it is the repair work of the walls that eat up the entire supply of our time. Preparatory work takes place in two stages - removing the old coating and leveling the walls.
There is not much difference in the technology for removing the old coating from the ceiling or walls. The main thing is not to forget to call on patience for help, because the wallpaper glued in several layers will have to be soaked and sequentially ripped off layer by layer.
To remove old tiles, which are most often located in the kitchen, bathroom and toilet, you will have to arm yourself with a chisel, hammer or puncher.
Remember: primer is an important part of any repair work. After all, the primer and putty are the basis not only for finishing work, but also for complex apartment renovation. Its main function is to improve the adhesion of finishing materials to the wall, therefore, the primer is made under such finishing materials as wallpaper, paint or plaster of walls with plaster.
Where to begin? To carry out the operation to level the walls, putty and plaster will be required. Each toolkit is selected individually depending on the scale of the disaster: if irregularities (small dimples, cracks and dents) do not reach a depth of more than 5 mm, then puttying can be dispensed with; if the depth of defects is more than 5 mm, use plaster.
Well, the finishing touch in such a complex operation is painting and gluing wallpaper on the prepared walls. Paper, textile, vinyl, metallized, cork, non-woven, soundproof wallpaper for the nursery - all that remains is to choose a new look for your cozy nest.
We hope that now you are not wondering where to start the renovation work. After all, you know the main stages of work. As the site is filled with materials, you will have a complete guide for apartment renovation, touching on all aspects, up to interior design and the choice of building materials and tools.
Repair cost, approximate cost estimate for apartment work

Video:

Video:

Video:

Video:

Video:
Average cost of construction work in an apartment
Unit rev. | Price, rubles | ||
1. Floors | |||
1 | Removal of linoleum, carpet (without preservation) 1 layer | m² | 100 |
2 | Removal of hardboard, plywood (without preservation) 1 layer | m² | 90 |
3 | Dismantling wooden / plastic skirting boards (without saving) | n.m | 40 |
4 | Removal of parquet / laminate that has been installed in a floating way (without preservation) | m² | 165 |
five | Removal of parquet / laminate that is laid on glue and nails (no preservation) | m² | 215 |
6 | Dismantling the screed (up to 50 mm) | m² | 240 |
7 | Dismantling the screed (up to 100 mm) | m² | 300 |
eight | Dismantling the lag | m² | 120 |
nine | Dismantling the wooden floor (without saving) | m² | 275 |
ten | Removing tiles | m² | 120 |
eleven | Dismantling of reinforced concrete plinth | n.m | 100 |
12 | Dismantling of floor granite slabs (without saving) | m² | 360 |
13 | Ceramic stitching. tiles | m² | 100 |
fourteen | Installing beacons on the floor | n.m | 70 |
fifteen | Backfilling expanded clay under the screed | m² | 100 |
sixteen | Floor insulation with expanded polystyrene | m² | 165 |
17 | Installation of cement-sand screed up to 50 mm | m² | 420 |
18 | Installation of cement-sand screed from 50 mm to 100 mm | m² | 650 |
nineteen | Reinforcement of the screed with a metal mesh | m² | 60 |
20 | Finishing screed device with self-leveling mixture | m² | 295 |
21 | Floor waterproofing device (mastic) | m² | 190 |
22 | Floor waterproofing device (roll) | m² | 290 |
23 | Priming of cement-sand screed with concrete contact | m² | 60 |
24 | Priming of cement-sand screed with acrylic primer | m² | thirty |
25 | Plywood flooring and cutting with glue | m² | 230 |
26 | Plywood flooring and cutting for bituminous mastic | m² | 240 |
27 | Plywood sanding | m² | 130 |
28 | Laying the substrate on a heat / sound / waterproofing base | m² | 50 |
29 | Laying wooden logs | n.m | 100 |
thirty | Laying commercial linoleum | m² | 300 |
31 | Processed seams in commercial linoleum | n.m | 60 |
32 | Laying linoleum | m² | 200 |
33 | Carpet flooring | m² | 190 |
34 | Laying cork flooring | m² | 360 |
35 | Laminate flooring | m² | 350 |
36 | Parquet scraping | m² | 300 |
37 | Parquet putty | m² | 90 |
38 | Floating parquet flooring | m² | 400 |
39 | Flooring parquet boards with glue | m² | 500 |
40 | Block parquet laying (with a break, herringbone) | m² | 900 |
41 | Floating solid board flooring | m² | 600 |
42 | Planking solid boards with glue | m² | 700 |
43 | Adjustable floors | m² | 500 |
44 | Floor painting | m² | 160 |
45 | Floor varnishing | m² | 200 |
46 | Installation of skirting boards (wood or PVC) | n.m | 150 |
47 | Varnishing wooden skirting boards | n.m | 50 |
48 | Ceram masonry. standard size tiles (20 × 30, 40) | m² | 840 |
49 | Ceram masonry. standard size tiles diagonally | m² | 900 |
50 | Ceram masonry. tiles less than (20 × 30, 40) | m² | 960 |
51 | Ceram masonry. tiles less than (20 × 30, 40) diagonally | m² | 990 |
52 | Porcelain stoneware masonry | m² | 1,500 |
53 | Laying mosaic tiles or complex patterns (price from) | m² | 1,300 |
54 | Grouting (mosaic) | m² | 250 |
55 | Ceramic grouting. tiles / porcelain stoneware | m² | 180 |
56 | Washed down tiles at 45 degrees | n.m | 495 |
57 | Facing of steps with ceram. tiles | m² | 1,050 |
58 | Ceram masonry. border, plinth, ornament | n.m | 240 |
59 | Installation of a metal nut | n.m | 120 |
60 | Shelter floor | m² | 80 |
2. Walls | |||
61 | Removing old wallpaper 1st layer | m² | 70 |
62 | Cleaning walls from water paints | m² | 170 |
63 | Cleaning walls from non-aqueous paints | m² | 200 |
64 | Removing tiles | m² | 150 |
65 | Cleaning walls from putty | m² | 180 |
66 | Removing the ventilation grill | units | 100 |
67 | Dismantling plaster | m² | 235 |
68 | Dismantling brick walls (1/2 brick) | m² | 285 |
69 | Dismantling of brick walls (1 brick) | m² | 495 |
70 | Dismantling of partitions made of reinforced concrete of thicknesses. up to 8 cm | m² | 2420 |
71 | Dismantling of partitions made of reinforced concrete of thicknesses. up to 16 cm | m² | 3795 |
72 | Dismantling of walls made of foam blocks, drywall, wood | m² | 350 |
73 | Dismantling of gypsum concrete partitions | m² | 450 |
74 | Wall masonry from foam blocks | m² | 540 |
75 | Laying of curved partitions from foam blocks | m² | 740 |
76 | Brick wall masonry (1/2 brick) | m² | 665 |
77 | Bricklaying walls | m² | 970 |
78 | Bricklaying of complex partitions made of bricks | m² | 1 150 |
79 | Concrete wall opening | m² | 4235 |
80 | Opening in a brick wall (1/2 brick) | m² | 2365 |
81 | Opening a brick wall | m² | 3025 |
82 | The device of an opening in the wall from foam blocks | m² | 1540 |
83 | Waterproofing walls (mastic) | m² | 190 |
84 | Installation of plasterboard partitions in 1 layer | m² | 540 |
85 | Installation of plasterboard partitions in 2 layers | m² | 670 |
86 | Wall cladding with plasterboard in 1 layer on a metal frame with installation of shumanet | m² | 420 |
87 | Wall cladding with plasterboard in 2 layers on a metal frame with installation of shumanet | m² | 490 |
88 | Plasterboard box device | n.m | 550 |
89 | Bonding joints with serpyanka | n.m | 45 |
90 | Wall cladding with clapboard on the frame | m² | 500 |
91 | Wall cladding with plastic panels on the frame | m² | 430 |
92 | Thermal insulation of walls with mineral plates, foam | m² | 150 |
93 | Wall soundproofing device | m² | 550 |
94 | Painting net installation | m² | 90 |
95 | Gluing walls with fiberglass | m² | 150 |
96 | Priming walls with concrete contact | m² | 75 |
97 | Installation of plaster beacons | n.m | 80 |
98 | Metal reinforcing mesh device | m² | 120 |
99 | Plastering walls up to 20 mm | m² | 600 |
100 | Plastering of walls from 20 mm to 50 mm | m² | 650 |
101 | Priming walls with acrylic primer 3 cycles | m² | 135 |
102 | Priming walls with acrylic primer 4 cycles | m² | 180 |
103 | Installation of painting corners | n.m | 60 |
104 | Plastered walls 1 cycle | m² | 295 |
105 | Plastered walls 2 cycles | m² | 450 |
106 | Wall grinding 1 cycle | m² | 70 |
107 | Wall sanding 2 cycles | m² | 140 |
108 | Gluing walls with fiberglass | m² | 230 |
109 | Finishing wall putty 1 cycle | m² | 210 |
110 | Finishing wall putty 2 cycles | m² | 350 |
111 | Wall painting (2 layers) | m² | 245 |
112 | Decorative plastering | m² | 1 100 |
113 | Sticking walls with vinyl wallpaper without selecting a pattern | m² | 220 |
114 | Wall gluing with vinyl wallpaper with pattern selection | m² | 280 |
115 | Sticking walls with non-woven wallpaper without selecting a pattern | m² | 300 |
116 | Sticking walls with non-woven wallpaper with pattern selection | m² | 350 |
117 | Sticking walls with textile wallpaper | m² | 750 |
118 | Sticking walls with linkrusty | m² | 1,000 |
119 | Sticking a wallpaper border | n.m | 130 |
120 | Wall cladding with ceramic tiles of one pattern 100 × 100 | m² | 970 |
121 | Wall cladding with ceramic tiles of one pattern 200 × 200 | m² | 850 |
122 | Wall cladding with ceramic tiles of one pattern 200 × 300 | m² | 825 |
123 | Ceramic wall cladding. tiles of the same pattern in different sizes | m² | 1,000 |
124 | Laying the mosaic on the finished surface (price from) | m² | 1,300 |
125 | Laying tiles on the wall | m² | 1,500 |
126 | Washed down tiles at 45 degrees | n.m | 495 |
127 | Installing a ceramic border | n.m | 250 |
128 | Installation of decorative corners | r.m | 100 |
129 | Decorative stone gluing | m² | 825 |
130 | Grouting (mosaic) | m² | 250 |
131 | Ceramic grouting. tiles | m² | 180 |
132 | Priming of slopes with concrete contact | n.m | 75 |
133 | Plastering slopes | n.m | 540 |
134 | Slope priming 3 cycles | n.m | 120 |
135 | Slope priming 4 cycles | n.m | 160 |
136 | Slope putty | n.m | 300 |
137 | Grinding slopes | n.m | 70 |
138 | Gluing slopes with fiberglass | n.m | 230 |
139 | Finishing slope putty 2 cycles | n.m | 350 |
140 | Slope painting (2 layers) | n.m | 260 |
141 | Ventilation grille installation | units | 250 |
3. Ceilings | |||
142 | Removing old wallpaper 1st layer | m² | 90 |
143 | Cleaning the ceiling from water paints | m² | 190 |
144 | Cleaning the ceiling from non-aqueous paints | m² | 310 |
145 | Cleaning the ceiling from putty | m² | 190 |
146 | Cleaning the ceiling from foam tiles | m² | 250 |
147 | Dismantling the slatted ceiling in the bathroom | m² | 250 |
148 | Dismantling of stucco molding and ceiling cornices | n.m | 250 |
149 | Dismantling of PVC ceiling cornices | n.m | 150 |
150 | Dismantling plaster | m² | 240 |
151 | Dismantling the ceiling from gypsum plasterboard in 1 level | m² | 140 |
152 | Dismantling the ceiling from gypsum board in 2 levels | m² | 210 |
153 | Joining and cracking | n.m | 120 |
154 | Ceiling waterproofing device (mastic) | m² | 250 |
155 | Plasterboard box device | n.m | 750 |
156 | Plasterboard suspended ceiling in one layer | m² | 445 |
157 | Arrangement of a suspended ceiling in two layers of plasterboard | m² | 550 |
158 | Installation of a multilevel ceiling made of gypsum plasterboard | m² | 660 |
159 | Arrangement of 2 levels of the ceiling of a complex geometer. shape | m² | 750 |
160 | 2-level ceiling device with built-in interior lighting | m² | 825 |
161 | The device of the 2 level ceiling is a simple geometer. shape | m² | 660 |
162 | Bonding joints with serpyanka | r.m | 45 |
163 | Installation of a mirrored false ceiling from 10 m². | m² | 725 |
164 | Installation of a slatted ceiling in the bathroom | m² | 880 |
165 | Arrangement of a false ceiling of the "Armstrong" type | m² | 250 |
166 | Insulation of the ceiling with mineral plates, foam | m² | 200 |
167 | Sheathing of the ceiling with clapboard on the frame | m² | 545 |
168 | Ceiling cladding with plastic panels on the frame | m² | 460 |
169 | Installation of turnkey stretch ceiling (price from) | m² | 650 |
170 | Installation of plaster beacons | n.m | 95 |
171 | Metal reinforcing mesh device | m² | 110 |
172 | Ceiling priming with concrete contact | m² | 75 |
173 | Ceiling plastering up to 20 mm | m² | 630 |
174 | Ceiling plastering from 20 mm to 50 mm | m² | 670 |
175 | Ceiling primer with acrylic primer 3 cycles | m² | 135 |
176 | Ceiling primer with acrylic primer 4 cycles | m² | 180 |
177 | Installation of painting corners | n.m | 75 |
178 | Ceiling putty 1 cycle | m² | 360 |
179 | Ceiling putty 2 cycles | m² | 500 |
180 | Ceiling grinding 1 cycle | m² | 90 |
181 | Ceiling sanding 2 cycles | m² | 180 |
182 | Gluing the ceiling with fiberglass | m² | 280 |
183 | Ceiling finishing putty 2 cycles | m² | 380 |
184 | Putty, grinding curved ceiling elements | n.m | 620 |
185 | Fiberglass gluing of curved ceiling elements | n.m | 250 |
186 | Ceiling painting (2 layers) | m² | 280 |
187 | Gluing the ceiling with vinyl wallpaper without selecting a pattern | m² | 280 |
188 | Pasting the ceiling with wallpaper for painting | m² | 300 |
189 | Sticking the ceiling with vinyl wallpaper with pattern selection | m² | 360 |
190 | Bonding the ceiling with non-woven wallpaper without selecting a pattern | m² | 370 |
191 | Ceiling gluing with non-woven wallpaper with pattern selection | m² | 420 |
192 | Bonding the ceiling with textile wallpaper | m² | 900 |
193 | Installation, pulling and plastering of plaster moldings around the perimeter (price from) | n.m | 500 |
194 | Installation, putty of polyurethane foam ceiling cornices | n.m | 290 |
195 | Painting of polyurethane foam ceiling cornices 2 cycles | n.m | 100 |
4. Electrical work | |||
196 | Dismantling electrical wiring | n.m | 40 |
197 | Dismantling of spotlights, sockets, switches | units | 60 |
198 | Plugs for sockets, switches | units | 170 |
199 | Dismantling the chandelier (price from) | units | 150 |
200 | Dismantling the power shield | units | 420 |
201 | Slitting concrete for electrical wiring 20x40 mm | n.m | 240 |
202 | Slitting bricks for electrical wiring 20x40 mm | n.m | 180 |
203 | Slitting plaster for electrical wiring 20x40 mm | n.m | 120 |
204 | Sealing the strobe | n.m | 170 |
205 | Holes in concrete 25 mm | units | 240 |
206 | Holes in brick 25 mm | units | 120 |
207 | Power cable routing up to 6 mm² | n.m | 90 |
208 | Low-voltage cable laying | n.m | 45 |
209 | Junction box installation | units | 180 |
210 | Installing a transformer (12V) | units | 240 |
211 | Installation of trays | n.m | 320 |
212 | Installation of an electric box with a cross section up to 50x50 mm | n.m | 100 |
213 | Installation of an electric box with a section up to 200x50 mm | n.m | 200 |
214 | Installation of an internal flap for 24 modules (concrete) | units | 4235 |
215 | Installation of an internal shield for 24 modules (brick) | units | 3025 |
216 | Installing a low-current shield | units | 1 210 |
217 | Assembling the power shield (price from) | units | 5,000 |
218 | Installing the outer shield | units | 1815 |
219 | Laying underfloor heating element | m² | 800 |
220 | Connecting and installing a rheostat for a warm floor | units | 400 |
221 | Installation of socket outlets in concrete | units | 230 |
222 | Installation of socket outlets in brick, plaster | units | 180 |
223 | Installing an electrical outlet, switch | units | 380 |
224 | Ring setting | units | 350 |
225 | Installation of video intercom | units | 550 |
226 | Connecting an electric heated towel rail | units | 1870 |
227 | Fan connection and installation | units | 485 |
228 | Installation of spotlights | units | 370 |
229 | Installation of sconces | units | 450 |
230 | Ceiling light installation | units | 550 |
231 | Installing the hook under the chandelier / lamp | units | 180 |
232 | Installation of a chandelier 3-arm diameter up to 50 cm | units | 500 |
233 | Chandelier installation 3-arm diameter from 50 cm | units | 700 |
234 | Installation of chandelier 5-arm diameter up to 50 cm | units | 650 |
235 | Installation of chandelier 5-arm diameter from 50 cm | units | 850 |
5. Plumbing work | |||
236 | Dismantling of PVC pipes | n.m | 130 |
237 | Dismantling of cast iron pipes | n.m | 150 |
238 | Dismantling water pipes | n.m | 130 |
239 | Dismantling the bath | units | 1,700 |
240 | Dismantling the kitchen sink | units | 420 |
241 | Dismantling the sink | units | 620 |
242 | Dismantling the heated towel rail | units | 480 |
243 | Dismantling the washing machine | units | 300 |
244 | Dismantling "moidodyr" | units | 330 |
245 | Dismantling the shower | units | 900 |
246 | Dismantling the toilet bowl, bidet | units | 550 |
247 | Removing the radiator | units | 330 |
248 | Dismantling the mixer | units | 190 |
249 | Dismantling the crane, filter, reducer | units | 165 |
250 | Slitting bricks for communications 50x70 | n.m | 650 |
251 | Slitting concrete for communications 50x70 | n.m | 1,400 |
252 | Sealing the strobe | n.m | 170 |
253 | PVC sewer pipe laying | n.m | 210 |
254 | Laying of pipes made of metal-plastic with a diameter of up to 32 mm | n.m | 290 |
255 | Polypropylene pipe laying | n.m | 230 |
256 | Copper pipe laying | n.m | 400 |
257 | Brazing copper pipes | PC. | 600 |
258 | Installation of copper fittings (angle, tee, cross, coupling, etc.) | PC. | 350 |
259 | Installing the comb | units | 960 |
260 | Installation of filter, reducer | units | 960 |
261 | Installation of bathtubs cast iron / steel / acrylic | units | 2,200 |
262 | Installation of a shower cabin with a connection | units | 5445 |
263 | Installation of "moidodyr" | units | 1,650 |
264 | Installing a shell, tulip | units | 1 450 |
265 | Installing the shower bar | units | 400 |
266 | Installation installation | units | 2420 |
267 | Installing a toilet or bidet | units | 2,145 |
268 | Installing a heating radiator in a regular place | units | 650 |
269 | Installing a new heating radiator | units | 3,000 |
270 | Installation of a heating radiator with a tie-in into a riser | units | 5445 |
271 | Installing a heated towel rail | units | 2,500 |
272 | Installation of a storage type water heater | units | 2 300 |
273 | Installation of a flowing water heater | units | 1,650 |
274 | Installing accessories | units | 250 |
275 | Washing machine connection | units | 1,400 |
276 | Heating pipes painting 2 cycles | n.m | 70 |
6. Carpentry work | |||
277 | Dismantling the door leaf | units | 100 |
278 | Dismantling the door block | units | 275 |
279 | Installation of a swing door block | units | 1 900 |
280 | Installation of a swing door with hinges inset, locks with door frame installation, with platbands and extensions | set | 3,000 |
281 | Installation of platbands | set | 990 |
282 | Installation of extensions | set | 1 100 |
283 | Installation of a sliding door block | units | 2 100 |
284 | Installation of a double-leaf sliding door block | units | 2700 |
285 | Installation of a double swing door | units | 2,200 |
286 | Insert door hinges, locks with handles | set | 600 |
287 | Painting windows | m² | 360 |
288 | Door painting | m² | 420 |
7. Transport costs | |||
289 | Removal of construction waste bags | units | 80 |
290 | Removal of bags of construction waste (floors without an elevator) | units floor | 40 |
291 | Skidding of building materials | t | 1,500 |
292 | Skidding of building materials (floors without an elevator) | t floor | 750 |
293 | Removal of construction waste in 8m3 containers (with a container weight of up to 5 tons) | cont. | 6,000 |
294 | Removal of construction waste in 20m3 containers (with a container weight of up to 15 tons) | cont. | 14,000 |
295 | Removal of construction waste in 27m3 containers (with a container weight of up to 26 tons) | cont. | 18,000 |
296 | Removal of construction waste in 32m3 containers (with a container weight of up to 26 tons) | cont. | 20,000 |
297 | Delivery of building materials | t | 1,700 |
Recommended:
Water Supply Of The Apartment Tips And Methods Of Installing Plumbing Pipes. What Pipes To Choose For Plumbing Video Tips

Which tube to choose for an apartment, advice on the installation and laying of water pipes from different manufacturers video tutorials on laying and technical characteristics
Stages Of Work On Pouring A Concrete Screed In An Apartment

Do-it-yourself concrete screed installation technology, nuances of the preparatory stage and reinforcement requirements, installation work on the construction of a concrete screed
Where To Start Carrying Out Major Repairs In An Apartment

Actions when carrying out major or cosmetic repairs in the room, where to start repairing from the walls or ceiling, to fill the floor or plaster
When To Start Making Repairs Is Better, In Summer Or Winter. Tips On How To Start A Repair

Detailed examples of when it is better to make repairs in an apartment, where to start and what is the order of the work. Examples and tips of the masters of apartment renovation
How To Start A Kitchen Renovation 20 Kitchen Renovation Mistakes

How to avoid mistakes in kitchen planning. An important base of the room is the working triangle: stove, refrigerator and sink. These zones should be at the closest distance from each other, the rules of space are simple